The company provides 7x24-hour telephone service (400-994-7668) support. Users can contact technical engineers online to inquire about problem solutions and technical guidance. If problems that cannot be solved remotely, they will rush to the scene to assist in solving them within 24 hours at the earliest.
Technical Training
We provide the end users of each project with one week of factory basic training and 3 days of intensive training at the installation site (specified by the customer), and can provide different levels of advanced training according to the special needs of users. The training service mainly includes the daily maintenance and operation of the robot, the basics of robot programming, the training of the system operation process, and accompanying teaching materials.
Spare Parts Supply
Reserve appropriate spare parts for common consumables according to their serial numbers, and respond to possible maintenance and replacement in a timely manner.
•The equipment mainly puts the product into the roller silo manually, conveys the material to the labeling station through the roller chain line for labeling, and then performs automatic re-inspection of the product. It has the functions of random inspection and automatic discharge of NG products, and finally automatically discharges the finished product.
This equipment manually puts the work-piece into the jig, and clicks the two sides of the machine to start the switch; the film sticking mechanism absorbs 1pcs of protective film from the protective film taking position, and transfers it to the position directly above the jig, and then the suction head in the film sticking mechanism swings to a certain extent Angle, so that the protective film is scratched and pasted on the surface of the TP screen & battery back cover....
The equipment adopts the vibrating plate feeding method to implement the automatic material distribution of the distributor. The screw is transported into the fish mouth of the locking screw mechanism by blowing air through the pipe, and the material is manually loaded and unloaded. The four-station turntable transports the material. The equipment implement the automatic screwing function....
• The line body is mainly composed of 6 sets of automatic equipment, 2 sets of semi-automatic equipment, and 2 artifcial belt lines; it mainly completes the D assembly process of cigarette warheads. The 6 sets of fully auto matic equipment are all loaded manually, and the NG and sampling stations need to manually take out the products.
1. This line body is suitable for the process of automatically attaching foam to various positions inside the tablet computer;
2. The line body is spliced by each modular single machine, and the product is placed in the fixture to implement the return flow through the upper and lower belts.